Bridge Condition Assessment and Prioritization using Bridge Management System in Kutai Timur Regency

Main Article Content

Aco Wahyudi Efendi
Novia Safitri
Muh Yusuf
Irwan Faisal Luzan
Azan Zubran

Abstract

This study evaluates the condition of 215 bridges across 18 sub-districts in East Kutai Regency using a Bridge Management System (BMS). Primary data was collected through visual inspections, analyzing element-specific (foundation, substructure, superstructure, and deck) and overall condition ratings. The bridge inventory is predominantly timber construction (48.37%) and features mostly short spans, though critical long-span bridges exist. Results indicate most foundation, substructure, superstructure, and deck elements are in good condition (ratings 1-2). However, a significant percentage of elements show moderate to severe damage (ratings 3-5), with 1.86% of decks and superstructures in critical condition. A bridge prioritization model was developed based on condition ratings and urgency. Strategic recommendations include data-driven maintenance planning, efficient budget allocation, and enhancing human resource capacity and technology for sustainable bridge asset management, minimizing infrastructure failure risks


 Downloads Statistics

Download data is not yet available.

Article Details

 How to Cite
Wahyudi Efendi, A., Safitri, N., Yusuf, M., Luzan, I. F., & Zubran, A. (2025). Bridge Condition Assessment and Prioritization using Bridge Management System in Kutai Timur Regency. Nusantara Civil Engineering Journal, 3(2), 54-67. https://doi.org/10.32487/nuce.v3i1.636
 Section
Articles
 Share This Link

References

Adamu, M., & Adebayo, S. (2022). A Review of Prediction Models for Bridge Deterioration and Performance. Journal of Civil Engineering and Construction, 5(2), 115–125.
Alisjahbana, R., Firmansyah, A., & Sumardi. (2021). Pemanfaatan Teknologi Drone dan Sistem Informasi Geografis dalam Inspeksi Jembatan. Jurnal Rekayasa Sipil Dan Lingkungan, 6(2), 89–98.
American Association of State Highway, & Officials, T. (2018). Manual for Bridge Element Inspection. AASHTO.
Basuki, H., Suryolelono, K. B., & Wibowo, A. (2021). Evaluasi Kondisi dan Penentuan Prioritas Penanganan Jembatan Menggunakan Metode BMS (Studi Kasus: Jembatan di Kabupaten X). Jurnal Karya Teknik Sipil, 10(1), 60–70.
Dorafshan, S., & Maguire, M. (2018). Bridge inspection: human performance, unmanned aerial systems and automation. Journal of Civil Structural Health Monitoring. https://doi.org/10.1007/s13349-018-0285-4
Hearn, G., & Russell, A. D. (2017). Bridge Management Systems: An Integrated Approach. CRC Press.
Hudson, W. R., Haas, R., & Uddin, W. (1997). Infrastructure Management: Integrating Design, Construction, Maintenance, Rehabilitation, and Renovation. McGraw-Hill.
Khalafalla, E. E., & Ali, A. H. M. (2020). Inspection and rehabilitation of old White Nile steel bridge substructure. FES Journal of Engineering Sciences. http://journal.oiu.edu.sd/index.php/fjes/article/view/659
Kim, H., & Lee, D. (2018). ’Fatigue behavior of FRP-reinforced steel structures under cyclic loading. Engineering Structures, 176, 45–56.
Kim, H., & Lee, D. (2020). Life-Cycle Cost Analysis of Bridge Deck Rehabilitation Strategies. Journal of Bridge Engineering, 25(6), 4020042.
Lee, G. Y., Kim, M., Quan, Y. J., Kim, M. S., Kim, T. J. Y., & ... (2018). Machine health management in smart factory: A review. Journal of Mechanical …. https://doi.org/10.1007/s12206-018-0201-1
OECD. (2007). Bridge Management. OECD Publishing.
Pangestu, D. S., Indrayanti, R., & Suparno. (2022). Aplikasi Bridge Management System (BMS) untuk Prioritas Penanganan Jembatan di Kota Semarang. Jurnal Teknik Sipil Dan Lingkungan, 7(1), 1–10.
Pratiwi, D., Susilo, Y. O., & Priantari, W. (2021). Analisis Prioritas Penanganan Jembatan Menggunakan Analytical Hierarchy Process (AHP) (Studi Kasus: Jembatan di Kabupaten Sidoarjo). Jurnal Mahasiswa Jurusan Teknik Sipil, 3(1), 23–32.
Pratiwi, S. W., Arjudin, A., Kurniati, N., & ... (2021). Penerapan Konsep Persamaan Diferensial Biasa Pada Pemodelan Tali Penahan Jembatan Gantung. Griya Journal of …. https://mathjournal.unram.ac.id/index.php/Griya/article/view/115
Putra, M. P. R. (2018). Modifikasi Jembatan Duplikasi Musi 2 Dengan Menggunakan Cable-Stayed Modified-Fan Pattern Two Inclined Planes System Dengan Twin Rectangular Steel Box …. repository.its.ac.id. https://repository.its.ac.id/55489/
Putra, Y. F., Rahmah, S., & Sari, N. L. (2023). Evaluasi Kondisi Jembatan dan Penentuan Prioritas Perbaikan Menggunakan Bridge Management System (Studi Kasus: Jembatan di Kota Banda Aceh). Jurnal Rekayasa Sipil Dan Teknik Lingkungan, 2(1), 30–40.
Saaty, T. L. (1980). The Analytic Hierarchy Process. McGraw-Hill.
Setiawan, A., & Yulianto, H. (2019). Studi Prioritas Penanganan Jembatan Menggunakan Metode Multikriteria (Studi Kasus: Jembatan di Kabupaten Trenggalek). Jurnal Teknologi Sipil, 18(2), 173–182.
Sukmana, M. R., Setiadi, A., & Wibisono, S. (2020). Implementasi Bridge Management System (BMS) dalam Pengelolaan Infrastruktur Jembatan di Provinsi Jawa Barat. Jurnal Teknik Sipil, 27(1), 1–10.
Tarawneh, B., Bodour, W. Al, & Masada, T. (2018). Inspection and risk assessment of mechanically stabilized earth walls supporting bridge abutments. Journal of Performance of …. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001132
Wulansari, E. D., & Widyatmoko, W. S. (2022). Evaluasi Kondisi Jembatan dan Prioritas Penanganannya dengan Metode Bridge Management System (BMS) di Ruas Jalan Provinsi Jawa Barat. Jurnal Rekayasa Sipil, 11(1), 45–56.
Zardari, N. H., Ahmed, K., Shirazi, S. M., & Bazmi, A. A. (2015). Weighting Methods and their Effects on Multi-Criteria Decision Making Model Outcomes in Water Resources Management. Springer.
                      https://doi.org/10.32487/nuce.v3i1.636