Analisis Penggunaaan Metode Penjadwalan Line of Balance Pada Proyek Kosntruksi Repetitif

Main Article Content

Lisa Nun Saskia

Abstract

The construction project is a series of activities related to the development efforts of a building within the constraints of time, cost, and quality specific covers principal job in the field of civil engineering and architecture. Line of Balance is a method of project scheduling in a line form that represents a work that is done repeatedly or repetitive. Methodology of this research was conducted by analyzing data on the number of workers and the duration of the processing time of each job from the field. The purpose of this study was to determine whether the method of the LOB can be used for residential development project of Grandcity Cluster Hyfield which are typical and repetitive so that it can overcome the problem of the duration of work in the field. The results of analysis by using Line of Balance method of residential development project in Grandcity Cluster Hyfield only takes 168 days, which is faster than the estimation of the owner, which lasts 45 weeks, or 312 days, with a difference of 144 days faster than the estimation. 


 Downloads Statistics

Download data is not yet available.

Article Details

 How to Cite
[1]
L. Nun Saskia, “Analisis Penggunaaan Metode Penjadwalan Line of Balance Pada Proyek Kosntruksi Repetitif”, JUTATEKS, vol. 4, no. 1, pp. 91-98, Jan. 2021.
 Section
Articles

References

[1] Arianto, Arif. 2010. Eksplorasi Metode Bar Chart, CPM, PDM, PERT, Line of Balance dan Time Change Diagram dalam Penjadwalan Konstruksi. Universitas Diponegoro. Semarang.
[2] Aulia, Muhammad. 2016. Analisis Penggunaan Metode Penjdawalan Line of Balance pada Proyek Kosntruksi Repetitif (Studi Kasus: Proyek Pembangunan Apartement Candiland-Semarang). Jurnal Karya Teknik Sipil.6 (1): 211-219.
[3] Juniarti, Reni. 2018.Sistem Administrasi Proyek. http://renijuniarti.blogspot.com/2018/03/sistem-administrasi-proyekpertemu an-1.html. (Diakses pada tanggal: 13 April 2020)
[4] Utami, Asri. 2018. Analisis Penjadwalan Waktu Proyek dengan Menggunakan Linear Scheduling Method (Studi Kasus: Proyek Pembangunan Perumahan Symphoni Bangutapan, Bantul, Yogyakarta). Tugas Akhir. Universitas Islam Indonesia Yogyakarta.
7