Up Structure ANALISA PRODUKTIVITAS PEKERJA PADA PEKERJAAN PASANGAN BATU BATA DI PERUMAHAN GRAND CITY BALIKPAPAN

TUGAS AKHIR

  • Syamsul Arifin Syamsul Politeknik Negeri Balikpapan
Keywords: productivity, 2019 SNI AHSPK, coefficients, percentages

Abstract

Productivity is defined as the ratio between output and input, or the ratio between production output and total resources used. The results of the observation show the value of Pet = 6.33 m2, Pep = 8.64 m2, Ptt = 5.71 m2, Ptp = 7.66 m2. And also obtained the coefficient of Ptt labor value of 0.17 Oh, Ptp worth 0.13 Oh. Calculation of the percentage of Ptt against Psni t obtained a percentage of 57.1%, Ptp against Psni p = 230%. Of the four projects, project C was the most productive project with a productivity of 6.86 m2 / oh, Project B was ranked second with a productivity of 6.23 m2 / oh, project A was ranked third with a productivity of 6.22 m2 / oh, and ranked fourth was project D with a productivity of 6.04 m2 / oh. The most dominant ineffective time occurs is the weather is not supportive, doing other work, and delays. It can be concluded that each project has a different productivity and the productivity of artisan in the field is lower compared to SNI and the productivity of artisan assistants is higher than SNI.

 Downloads Statistics

Download data is not yet available.

References

AHSPK SNI Tahun 2019.
Chye, Lim (2007), Analisa Produktivitas Tenaga Kerja pada pasangan dinding ½ bata merah dengan metode work study, Tugas Akhir, Tidak Diterbitkan, Teknik Sipil, Universitas Kapuas Sintang: Sintang.
Hartono, Nico dan Hasyim, Hamzah M dan Unas, Saifoe El (2007), Analisis Produktivitas Jumlah Tenaga Kerja Pada Pekerjaan Pasangan Bata Dengan Metode Work Study. Tugas Akhir, Tidak Diterbitkan, Progam Studi Teknik Sipil, Universitas Brawijaya: Malang.
Maulidi, Fitri (2017), Analisa Produktivitas Dan Faktor Yang Mempengaruhi Kinerja Tukang Pada Pemasangan Bata Dengan Metode Productivity Rating, Tugas Akhir, Tidak Diterbitkan, Progam Studi Teknik Sipil, Universitas Muhammadiah Malang: Malang.
Published
2019-09-18
How to Cite
[1]
S. A. Syamsul, “Up Structure ANALISA PRODUKTIVITAS PEKERJA PADA PEKERJAAN PASANGAN BATU BATA DI PERUMAHAN GRAND CITY BALIKPAPAN”, JUTATEKS, vol. 3, no. 2, pp. 110 - 119, Sep. 2019.