TA MANAJEMEN RISIKO KESEHATAN DAN KESELAMATAN KERJA PADA PROYEK PEMBANGUNAN JALAN TOL BALIKPAPAN-SAMARINDA SEKSI 4 Tugas Akhir
Main Article Content
Abstract
Abstract
(41.8%), and risks classified as moderate amounted to 4 risks (38.8%), and the risk classified as low amounted to 9 risks (19.4%).3 risks with a high category, namely the risk of heavy equipment noise during casting with a risk index (13.2), eyes of iron powder release during construction or reinforcement with a risk index (10.4), and when the eye casting is exposed to concrete splashes with risk index (10.4). Based on identification and assessment it was found that foundry work had a higher risk and a greater risk index. Keywords: Risk Management, Occupational Health and Safety (K3), AS / NZS 4330: 2004
Downloads Statistics
Download data is not yet available.
Article Details
How to Cite
[1]
rahmawati_euis Udin, “TA MANAJEMEN RISIKO KESEHATAN DAN KESELAMATAN KERJA PADA PROYEK PEMBANGUNAN JALAN TOL BALIKPAPAN-SAMARINDA SEKSI 4”, JUTATEKS, vol. 3, no. 1, pp. 106 - 115, Aug. 2019.
Section
Articles