TA ANALISIS PRODUKTIVITAS DAN EFISIENSI ALAT BERAT PEKERJAAN BORE PILE PADA PEMBANGUNAN OVERPASS PROYEK JALAN TOL BALIKPAPAN – SAMARINDA KM.13 TUGAS AKHIR
Main Article Content
Abstract
every civil construction work is always related to foundation work. out this research, , heavy equipment used to do bore pile foundation work such as Bore Machines, Crowler cranes, Excavators and Dump trucks. The tool has advantages and reviewed as an appropriate effort to produce effective and efficient work. In this study an analysis was carried out by means of data collection methods. Based on this, the objective to be achieved is to know the selection of more effective heavy equipment in the bore pile foundation work, and to know the efficiency of the use of heavy equipment in the bore pile.machine foundation work amounting to 2 units with a rental fee of Rp. 198,883,296.00 work time of 9 days, Crowler cranes amounted to 3 units with a rental fee of Rp. 137,509,848.00 work time of 3 days, Excavators per house 1 unit at a cost of Rp. 24,575,120.00 work time of 5 days, a dump truck totaling 2 units at a cost of Rp. 58,232,096.00 work time of 9 days. So the total time spent on the job is 26 days out of 30 days that have been determined and the cost of all heavy equipment is Rp. 419,145,992.00.
Downloads Statistics
Article Details
References
Pilcher, Roy, 1992, Principles of Construction Management. Third Edition.
McGraw-Hill Book Company Europe. England.
Rochmanhadi, 1982, Alat-alat Berat dan Penggunaannya, Departemen Pekerjaan
Umum, Jakarta.
Rostiyanti, Susi Fatena, 2008, Alat Berat Untuk Proyek Konstruksi, Rineka Cipta, Jakarta.
Tenriajeng, Andi Tenrisukki, 2003, Seri diklat Kuliah Pemindahan Tanah Mekanis, Gunadarma.
Wilopo, Djoko, 2009, Metode Konstruksi dan Alat-alat Berat, UI- pross, Jakarta.
2013. Katalog Alat Berat Untuk Proyek Konstruksi, Dinas Kementrian Pekerjaan Umum.
2016. Peraturan pemerintah pekerjaan umum No 11. Analisa Harga Satuan Pekerjaan Bidang Bina Marga Indonesia, Jakarta.