OCKTAVIA, D. (2019) “ANALISA PENJADWALAN DAN BIAYA MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) PADA PROYEK PEMBANGUNAN RUKO 3 LANTAI DI JALAN SOEKARNO HATTA KM 6 KOTA BALIKPAPAN ”, Jurnal Tugas Akhir Teknik Sipil, 1(1), pp. 82 - 86. Available at: https://ojs.poltekba.ac.id/ojs/index.php/jutateks/article/view/32 (Accessed: 23December2024).