[1]
Syamsuddin, I. 2021. Optimalisasi Alat Berat Pada Pekerjaan Galian Tanah Bangunan Pelimpah Atau Spillway (Studi Kasus Proyek Bendungan Sepaku-Semoi). Jurnal Tugas Akhir Teknik Sipil. 6, 1 (Oct. 2021), 57 - 63. DOI:https://doi.org/10.32487/jutateks.v5i2.328.